Schofield Parade - repair and maintenance.
- petereburton
- Oct 27, 2020
- 1 min read
Updated: Nov 12, 2020
Engineers will be looking to see what can be done to Schofield Parade's area of road subsidence, which will probably require some major works.
Will update this after inspections are made and a Plan in Place.
Further advice on this matter, Engineers have inspected Schofield Parade area of subsidence and note that is the area of subsidence, if the subsidence exceeds 100 mm there will be intervention to reconstruct the road. This point has not been reached so the actions for the moment is to repair the area of subsidence and level them off and keep monitoring the issue.
Comments